Skip to content

Process loss in Stock Entry #36591

@goapaints

Description

@goapaints

Information about bug

Process Loss can be defined in BOM in the scrap and process loss.
image

This is only the estimated process loss. Actual process loss can vary from batch to batch.

However, in the stock entry the system does not allow change in the process loss. On save, the value of the theoretical process loss is reset and FG qty is adjusted as "Qty to Manufacture - Std Process Loss".

The correct logic should take any entry of process loss and calculate FG qty as
"Qty to Manufacture - Entered Process Loss".

Module

manufacturing

Version

ERPNext: v14.31.3 (HEAD)
Frappe Framework: v14.42.0 (HEAD)

Installation method

FrappeCloud

Relevant log output / Stack trace / Full Error Message.

No response

Metadata

Metadata

Labels

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions